Engineering limits per 1 ha:
1. Electricity (connection from the transforming substation on the park territory, supplier - AO "LOESK") - 100 kW.
2. Heat supply (boiler room on the territory, gas supplier - GRO "Petreburggas") - 0.420 Gcal/hour.
3. Water supply (connection point on the territory, supplier - GUP Vodokanal SPb) - 6.0 m³/day.
4. Wastewater disposal (connection point on the territory, supplier - GUP Vodokanal SPb) - 6.0 m³/day.
crossing of KAD and highway Kola, Sverdlovskoye settlement
Direction
EastSouth
Distance to Ring Road
Distance to Ring Road — 0.03 km
Access roads
An exit to the park from the Kola federal highway (R-21) was built
Prospects for the development of transport infrastructure:
- construction of the metro station "Kudrovo";
- construction of the metro station "Novosaratovka";
- construction of the Koltushi - Novosaratovka highway with a transport interchange on the Kola federal highway with the organization of an exit / entrance into the park.
Main characteristics
Code — 01819
Object type
Industrial park
Type of development
Retail and commercial
Mixed-use development
Industrial and warehouse
Land category
Industrial
Public and commercial development
Permitted usage
Retail property development
Land for factories, plants and industrial complexes